CHS Performing Arts Center Renderings

Posted by Ed Petersen on 4/29/2019

Big changes are planned for our performing arts center at CHS. When phase 2 of the modernization project begins this summer, the work will include relocating our PAC. The current classitorium space will be leveled and become part of the new commons area. The space no occupied by the Senior Deck and locker pit will also be leveled to become our new performing arts center.

The new theater will feature moveable theater seating to make the space even more flexible. During normal school hours it can be used as part of the commons, with tables and chairs. For performances, tiered theater seating will pull from the back wall, and additional seats can be added on the floor for more capacity. Altogether, the new PAC will have capacity for more than 400 people, much better than our old classitorium.

Check out these renderings from our architect, BLRB.

PAC rendering

pac rendering

pac rendering

pac rendering