Achieving Excellence
Our current school building was originally constructed in 1957, with an addition in 1978. The buidling has long since become too smal for our student population. We are excited that construction on our new school buildng will begin in May 2018! Check this page often for updates about the design and construction process.
Take a look at the colors and materials for our new school!
2320 Borst Ave.
PO Box 610 Centralia, WA 98531
360-330-7600
Fax: 360-807-2888